Opportunity is Knocking. Value Add Property on a full acre with lot split in Process. Seller has done all of the heavy lifting, take the process to the finish line and have the options of selling off half acre lot or build an estate home with detached ADU. Seller has spared no expense on the quaint classic ranch on large half acre usable lot. Some of the upgrades include, New Roof, New Windows, New Electrical Inside the home with a New 200 Amp Panel. The Kitchen has been redone with new cabinets, sink, granite countertops, tile backsplash with replaced plumbing and new fixtures. Bathroom has also been updated with new lighting fixtures, vanity and new subway tile shower with fixtures. This home also has upgraded LVP flooring, fresh interior paint with new stucco on the exterior and a fresh coat of paint. Live on the half acre with the current home, while you build out your dream home and convert existing home into an ADU. Please see attached documents and overlay of lot lines for lot split. BHA Engineering in Carlsbad is the firm working on the Tentative Parcel map. Three submissions have been completed with corrections and the last step is approval with conditions of tentative map. Process was started 18 months ago and estimating another 4-6 months to completion.

Date Added: 7/17/22 at 7:00 am
Last Update: 7/29/22 at 4:34 am

Interior

  • GeneralOpportunity is Knocking. Value Add Property on a full acre with lot split in Process. Seller has done all of the heavy lifting, take the process to the finish line and have the options of selling off half acre lot or build an estate home with detached ADU. Seller has spared no expense on the quaint classic ranch on large half acre usable lot. Some of the upgrades include, New Roof, New Windows, New Electrical Inside the home with a New 200 Amp Panel. The Kitchen has been redone with new cabinets, sink, granite countertops, tile backsplash with replaced plumbing and new fixtures. Bathroom has also been updated with new lighting fixtures, vanity and new subway tile shower with fixtures. This home also has upgraded LVP flooring, fresh interior paint with new stucco on the exterior and a fresh coat of paint. Live on the half acre with the current home, while you build out your dream home and convert existing home into an ADU. Please see attached documents and overlay of lot lines for lot split. BHA Engineering in Carlsbad is the firm working on the Tentative Parcel map. Three submissions have been completed with corrections and the last step is approval with conditions of tentative map. Process was started 18 months ago and estimating another 4-6 months to completion.
  • RoomsBonus Room, Den
  • AppliancesDryer, Washer
  • Living RoomInside
  • FireplaceN/ K

Exterior

  • GeneralValley
  • PoolN/ K

Location

  • HOAYes
  • HOA Amenities0.0

Lot

  • ZoningR-1: SINGLE
  • ViewN/ K
  • RestrictionsStandard

Utilities

  • WaterPublic

Schools

  • DistrictVista Unified School District
  • ElementaryVista Unified School District
  • HighVista Unified School District

Virtual Tour

powered by

What's Nearby?

Restaurants
Coffee Shops
Grocery
Education

Map